|
|||
Project |
Client/Contractor/Role |
Location |
Project Scope & Description
|
Teapot Dome Acquisition |
Confidential |
Casper Wyoming |
$45.2M, Title due diligence, CERCLA Phase I environmental survey, reserves valuation and reservoir analysis
|
Caddo Parish Acquisitions |
Confidential |
Shreveport Louisiana |
$61M, Title due diligence, 50+ environmental surveys, reserve valuation and reservoir analysis
|
Wilson County Acquisitions |
Confidential |
Fredonia Kansas |
$30M, Title due diligence and land work, negotiate mineral purchases, environmental survey, environmental remediation, field surface operations, reserve and reservoir analysis
|
Massena Smelter Reconstruction |
Alcoa |
Massena New York |
$12M reconstruction of rod crushing facilities, bulk material handling and environmental controls
|
Rockdale Smelter Reconstruction |
Alcoa |
Rockdale Texas |
$7M reconstruction of rod crushing facilities, bulk material handling and environmental controls
|
Seadrift Coke |
Seadrift Coke LP |
Seadrift Texas |
$9M engineering and reconstruction of a metallurgical ‘needle’ coking facility for bulk material handling and controls
|
Council Bluffs Coal fired plant shutdown |
MidAmerican Energy |
Council Bluffs Iowa |
$7M engineering & reconstruction of coal handling facilities, bulk material handling and environmental controls
|
Sioux City Coal fired plant shutdown |
MidAmerican Energy |
Sioux City Iowa |
$3M engineering & reconstruction of coal handling facilities, bulk material handling and environmental controls
|
Venetian Hotel Central Plant |
Las Vegas Sands Corp |
Las Vegas Nevada |
$15M expansion of chiller plant and cooling towers, maintaining plant 100% on-line during critical client activity, new SCADA and commissioning.
|
Fitzsimmons Hospital Central Plant |
UCHSC University of Colorado Health Sciences Center |
Aurora Colorado |
$12M expansion of chiller plant and cooling towers, maintaining plant on line during critical client activity, new SCADA and commissioning
|
HTHP Boiler Replacement |
MEDDAC Ft Carson Colorado |
Ft Carson Colorado |
$10M HTHP Boiler plant replacement with 100% uptime and temporary boiler operations, new distribution and controls
|
Pine Bluff Arsenal HVAC |
USACE Raytheon |
Pine Bluff Arkansas |
$22M HVAC/MEP with filtration, precipitation & ductwork for the Pine Bluff Arsenal Chemical Weapons Demilitarization facility
|
Post-tensioned Water Tank
|
Villages at Granby, Colorado |
Granby Colorado |
$4.5M Water storage tank post-tensioned concrete, bid PM/CM all buy-out, remote mountain top, winter conditions
|
26th Ward Sludge Dewatering Facility NYC |
NYC DEQ Stone & Webster |
Brooklyn New York |
$22M Ground stabilization, structural poured in place concrete and rebar, UG utilities package and full process rough in up to pump pads.
|
Wastewater plants New Construction |
Vermont Towns
Municipalities John A Russell |
Bethel, Fair Haven and Proctor Vermont | $3-$5M Primary & Secondary wastewater plants and collection systems, new build with pump stations and separation of CSO.
|
Waterton Canyon Dam |
Morrison Knudsen Denver Water |
Denver Colorado |
Joined Leadville Local 1351 journeyman carpenter, moved to Denver Local 55 for industrial and heavy construction.
|
Project Superintendent |
Roberts Restaurants Marlowes Denver Goldie’s Delicatessen |
Denver, Colorado |
GC Superintendent, tenant finish
|
Project Superintendent |
Kittredge Building Historic Renovation |
Denver, Colorado |
GC Superintendent, tenant finish
|
Project Superintendent |
Arbys Pizza Hut Der Wienerschnitzel |
Denver, Colorado |
GC Superintendent
|
Contract framer and framing Superintendent |
US Homes, Medema Homes, Vesteq – San Mateo, CA |
Dallas/Denver/Vail/Steamboat Springs/Jackson Hole |
Framing tract homes and apartment, condominium and townhome projects
|